CN EN

Solution

SOLUTION

sale@sunshine-power.net

Position:Home > Solution
Monitoring solution for railway self closing through line
Released:2021-08-10

Railway self closing through lines are mostly laid in a combination of overhead and cable laying methods, using a neutral point ungrounded system, single-phase grounding without tripping, long-term operation, and many line defects. The railway self closing through line monitoring device monitors the fault frequency and traveling wave signals generated by line faults in real time, achieving precise positioning of fault points and identification of fault causes, effectively solving single-phase grounding faults and distinguishing whether faults occur in cable sections or overhead sections.

 

image.png

 


l Main technical indicators

Fault interval positioning accuracy: ≥ 99%

Fault precise positioning error: 200 meters

Fault cause identification accuracy: ≥ 90%

Working power supply: coupled power supply+solar power supply


l Applicable scope

Suitable for railway 10kV self closing through overhead lines, cable lines, mixed overhead cable racks, T-junction lines, etc.

 

Official Phone Business Phone O&M phone 0086-027-87420702 0086-13277695881 400-027-0051

Address:Weilai zhi guang Industry Park,No. 3 Guanggu Boulevard, East Lake High-tech Development Zone,Wuhan City, Hubei Province,China.

COPYRIGHT ?2016Wuhan Sunshine Power Technology Co., LTD. All Rights Reserved

Technical Support:Youhoo